Key Highlights
• Modeling of solidification
• Fail safe pattern
• Mold-Economy route
• Pouring - Good practice
• Proven casting
  Technical Specifications
• Shell molding: 1 kg to 25 kg
• Silicate molding: 5 kg to 2.5 ton
• Shot blasting: 1.5 ton hook type
• Welding: TUV verified
• In-house machining solutions
  Steel Foundry Division - Infrasturcture
 
• Manual and computer aided calculation system.
• Manual silicate - CO2 line with CBS system and shell
• 5 ton - 1.5 m x 1.5 m shakeout grid, with magnetic separater
• 5 ton, 3 ton, 200 kilo electrical furnace
 
  © LRT 2006   Powered by : Gene Macron Media Interactive